Posts Tagged ‘Subway’

  • Again before the Asian Games opening 71 km subway lines, will reach 20 2040

    Date: 2010.04.29 | Category: Asian Games News | Response: 0

    Guangzhou Daily reported on April 28 (Xinhua Zhu Xiaoyong) yesterday, “on the 2011 ~ 2015 Guangzhou rail transit construction program report” submitted to the Standing Committee session in this city. Municipal Development and Reform Commission Pan Jianguo introduced in the report, Guangzhou has launched operations five lines total 150 km, 71.6 km will be opened before the Asian Games. In addition, this year will start the implementation of the sixth line 2, on the 7th line and on the 9th line of the building.

    Pan Jianguo introduced, to be included in the construction of a new line of 2015 involving a total of nine, including 10 third line (East Express) as the first fish beads to Xintang neck Heights; on the 8th Line North extension section; on the 11th line (loop); on the 14th line of the main line to the blocks and the extension of new Golden Harvest and to the knowledge of the city (Knowledge City line); 10 third line to fish beads Fenggang paragraph 2; third line eastern extension (Panyu Square to clean, depending on the coordination of inter-city lines, such as the International Buddhist Guancheng line passing through Panyu Square, the Asian Games City corridor, the eastern extension delayed construction of third line); on the 7th line of two University of South Tai Sha East; on the 4th Line South Extension (Golden State – Information Park); on the 16th line (Licheng line).

    It is understood that the 9 total length of 248.7 km route. Under the current plan period, as at the end of 2015 will total 475.6 km subway line opened, under construction, 86.2 km.

    Input of the subway construction, Pan Jianguo introduced, from 2011 to 2015 a total investment of building a new line of 109.784 billion yuan, and the current line under construction, investment and planning to adjust line from 2016 to 2020 initial cost of the new line, involving a total investment of 189.3 billion element. Under the current arrangements for the initial period, demand for 2015 is about 155.15 billion yuan of funds.

    Where to invest 180 billion yuan?

    Municipal Standing Committee by the small pear in the group raised, rail transit construction funds up to more than 1800 billion come from?

    Municipal Development and Reform Commission replied that the person in charge, the report referred to in the funding of more than 1500 billion in estimates.

    According to the plan, a new round of rail transit construction on a scale greater than, therefore, municipal financial arrangements, the general budget from this year come up with one billion yuan per year to support the construction of rail network. Starting in 2010, annual funding to ensure fiscal arrangements less than 60 billion yuan, 6 years, 360 billion; second build under the city, the county investment of 50% principle, the county invested 260 billion yuan ; Third, land development and other benefits along can get around 21 billion; the fourth is comprehensive utilization of loans, issue bonds and other financing channels, they can raise about 70 billion yuan. The four combined to draw more than 1,500 millions of dollars.

    Planning line 2020

    On the 4th line (Nansha line): Huang Cun – Chebei Southern Section (5.4 km, 3 stations) under construction, new Jinzhou – Information Technology Park section (11.7 km, 5 sites), Huangcun – Water Western (12.9 km , 6 sites).

    V Line (Central City line): New Man Chong – Whampoa ferry terminal segment (9.8 km, 5 sites);

    On the 6th line (Luogang line): Xun Feng Gang – Yonghe, route of 48.8km, station 34;

    On the 7th line (University City line): Passenger Station – Big Sha East, route of 28.4km, station 13;

    On the 8th line (Pazhou line): Baiyun – Wanshengwei route of 31.7km, station 24;

    On the 9th line (Huadu line): fly Eling – high growth, route of 19.8km, station 8, the forward will be through third line operation;

    On the 10th line (five mountain line): East Sha – Tianhe Bus Station, line length 19.6km, station 15;

    On the 11th line (center ring): via New Kau Road – Pleasant View Road – Fangcun – Canton Rd – village on two Dahenglu route of 42.4 km, station 32;

    On the 12th line (the official Island Line): Cha Head – University of South route of 30.1km, station 24;

    10 third line (East Express): Sunrise – Xintang, route of 62.8km, station 26;

    On the 14th line (from the A line): the main line railway station to health from the valley, the main line length 84.4km, site 12. Extension into the knowledge city, station 4;

    On the 16th line (Xintang – Licheng): Long 31.7km, site 8;

    On the 20th Line (Passenger Station – Pazhou): length 17.5km, site 3.

    2040 built four new routes

    On the 15th line (Nansha island line):

    Small Nansha Island – Soul Mountain – Hengli – wanqingsha, line 30.5 km long, station 15;

    On the 17th line (Zini line):

    Zini – Lotus Hill, 25.7 km long line, station 11;

    On the 18th line (Haven line):

    Shiqiao – Lotus Hill, route of 31.3 km, station 15;

    On the 19th line (Riverside Road):

    Spike Salt Road – Cencun route of 29.9 km, station 21.

    Riverside Road, Dongfeng Road, will have the subway

    2020 Guangzhou Rail Transit Planning of 16, when the Guangzhou will achieve “a mere pass track”, the external Panyu, Huadu, Nansha, Luogang, Zengcheng and Conghua basic in 1 hour to reach downtown. Yesterday, the “2020 Guangzhou Rail Transit Planning” (hereinafter referred to as “program”) drew the Standing Committee of this city.

    Metro and passenger hub for seamless convergence

    Deputy Secretary for Urban Planning and described in the report Zhouhe Long, 2020 rail planning goals are: “3060″ time and space and “7070″ objective passenger, that speed around the city within 30 minutes to reach the city center, 60 minutes to the external sub-center to reach the city center; ring of high-speed public transport accounts for the amount of motorized travel up to 70% of the total transit rail travel amounted to 70%. It is reported that in 2020, Guangzhou rail line will reach 16, site 330.

    Planning encrypted line density downtown, filled Dongfeng Road, Huangpu Avenue, Riverside Road, Er Sha Island and other rail white space. 2020, Guangzhou Metro site within the loop within 600 meters to reach 80% coverage, the basic level up to international cities (London, 88%).

    At the same time, planning to achieve “small-pass track”, the external Panyu, Huadu, Nansha, Luogang, Zengcheng and Conghua basic in 1 hour to reach the city center. In addition, the MRT network will also enable the main external passenger hub (air, rail, road, water) to achieve seamless.

    11 inter-city rail connectivity Pearl River Delta

    It is reported that the Pearl River Delta Intercity Rail access will have 11 lines in Guangzhou, including Guangzhou clean lines, Guangzhou Dongguan Shenzhen line (including the Pazhou Extension), Kwong Wai line, Kwong Wan Hui line, Guangzhou-Zhuhai lines, line planning, wide Zhu Jiang River Line, Guang Zhao line, Guang West Loop, Zhao Shunnan line, Central line Dongguan lines.

    Zhou Helong in the “program” said 2040, Guangzhou Metro will be 20 long-term planning of urban rail lines and 11 PRD inter-city rail lines.

Blogroll

Categories

Tags

16th Asian Games Asia Asian asian games Asian Games News Asian Games Service Beijing Canton Champion Championship Championships China Chinese Chongqing Dongguan Finals Flowers Football Foshan Games Gold medal Guangdong GUangzhou Guangzhou Asian Guangzhou Asian Games Guangzhou Daily Hong Kong Japan Kazakhstan Korea Medals Olympics passenger Runner-up school Shooting Singer South Korea sports Swimming Volunteer Volunteers weightlifting world Wuhan

Recent Posts

Archives

Meta